Inspection method for electrofusion connection of PE pipe and PE pipe fittings

Mar 17, 2022

ご伝言


Check that the entire circumference of the pipes at both ends of the pipe fittings should have scraping marks; check that the melt during the fusion process does not seep out of the pipe fittings; check that the pipe fittings should be in the middle of the positioning lines of the pipes on both sides; check that the fusion indicator pin (if there is such a device) has been raised; ; Check that the pipes and fittings are aligned.



hdpe male socket

お問い合わせを送る